Skip to main content
02/06/2022 - 13:44

CZR grows iron ore resource by more than 50 per cent

02/06/2022 - 13:44

Bookmark

Save articles for future reference.

CZR Resources has increased the mineral resource at its Robe Mesa iron ore project in the Pilbara by more than 50 per cent whilst maintaining an iron ore grade of 56 per cent. Assay results reported in March revealed extensive direct shipping iron ore outside the prefeasibility study pit designs. The deposit’s JORC mineral resource has increased from 24.7 million tonnes to 37.5Mt.

X