Skip to main content
05/10/2022 - 14:56

Aruma fires up rig for second round in lithium hunt

05/10/2022 - 14:56

Bookmark

Save articles for future reference.

Aruma Resources has kicked off a second phase drilling campaign of up to 1800m over 12 holes at the company’s Mt Deans lithium and rubidium project 120km south of Kalgoorlie in WA. The drill holes will pierce down to depths as low as 120m in a follow-up program to first phase drilling and recent rock chip sampling that returned high-grade lithium and rubidium results. Aruma anticipates its work to be completed in mid-October with results to be released in due course.

X