Skip to main content
19/07/2012 - 15:24

Matilda signs up MSP at Keysbrook

19/07/2012 - 15:24

Bookmark

Save articles for future reference.

Matilda Zircon has appointed MSP Engineering as its front end engineering and design (FEED) contractor for its Keysbrook mineral sands project south of Perth.

X

To read our articles you will need to either login or subscribe.